🦂 Job History
← Back
CICR
2026-04-12 04:02
FIELD SCORPION JOB TICKET
------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
CICR Depth: 4050.0 ft
Bottom Perf: 4100.0 ft
Tubing: 2⅜" 4.7
Casing: 4½" 11.6
------------------------
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-12 02:10
FIELD SCORPION JOB TICKET
------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
CICR Depth: 4050.0 ft
Bottom Perf: 4100.0 ft
Tubing: 2⅜" 4.7
Casing: 4½" 11.6
------------------------
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-12 02:09
FIELD SCORPION JOB TICKET
------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
CICR Depth: 4050.0 ft
Bottom Perf: 4100.0 ft
Tubing: 2⅜" 4.7
Casing: 4½" 11.6
------------------------
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-12 02:00
FIELD SCORPION JOB TICKET
------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
CICR Depth: 4050.0 ft
Bottom Perf: 4100.0 ft
Tubing: 2⅜" 4.7
Casing: 4½" 11.6
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-12 01:50
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-11 17:59
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-11 17:55
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-11 17:47
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-11 17:45
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-11 17:16
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-11 17:10
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Rollover
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC (Tubing OUT): 3992.46 ft
TOC (Tubing IN): 3950.59 ft
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 15.289 bbl
Generated by Field Scorpion
CICR
2026-04-11 06:52
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-10 03:43
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-10 03:43
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-10 03:41
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-10 03:36
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-10 03:25
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 20.85 bbl
Mix Water: 14.04 bbl
Mix Water: 589.7 gal
TOC @ CICR: 5934.96 ft
Height Above CICR: 115.04 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 20.85 bbl
Mix Water: 14.04 bbl (589.7 gal)
Displacement Water: 17.15 bbl
Generated by Field Scorpion
CICR
2026-04-09 19:29
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 19:26
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 19:22
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
Height Above CICR: 64.37 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 19:17
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC @ CICR: 3985.63 ft
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 19:11
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 19:09
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 19:07
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 19:06
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 18:59
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 18:16
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 18:14
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 18:04
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 17:59
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 17:40
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC (Tubing IN): 3981.22 ft
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 17:35
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC (Tubing IN): 3981.22 ft
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 17:26
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC (Tubing OUT): 3981.22 ft
TOC (Tubing IN): 3981.22 ft
Cement Height (OUT): 0.0 ft
Cement Height (IN): 0.0 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 17:25
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC (Tubing OUT): 3981.22 ft
TOC (Tubing IN): 3981.22 ft
Cement Height (OUT): 0.0 ft
Cement Height (IN): 0.0 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 17:10
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC (Tubing OUT): 3981.22 ft
TOC (Tubing IN): 3981.22 ft
Cement Height (OUT): 0.0 ft
Cement Height (IN): 0.0 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 17:10
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC (Tubing OUT): 3981.22 ft
TOC (Tubing IN): 3981.22 ft
Cement Height (OUT): 0.0 ft
Cement Height (IN): 0.0 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 17:09
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC (Tubing OUT): 3981.22 ft
TOC (Tubing IN): 3981.22 ft
Cement Height (OUT): 0.0 ft
Cement Height (IN): 0.0 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 04:57
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC (Tubing OUT): 3981.22 ft
TOC (Tubing IN): 3981.22 ft
Cement Height (OUT): 0.0 ft
Cement Height (IN): 0.0 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 04:37
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC (Tubing OUT): 3981.22 ft
TOC (Tubing IN): 3981.22 ft
Cement Height (OUT): 0.0 ft
Cement Height (IN): 0.0 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
CICR
2026-04-09 04:07
FIELD SCORPION JOB TICKET
-------------------------
Job Type: CICR Squeeze
Workflow: Bottom Perfs Only
Slurry Volume: 21.18 bbl
Mix Water: 12.088 bbl
Mix Water: 507.7 gal
TOC (Tubing OUT): 3981.22 ft
TOC (Tubing IN): 3981.22 ft
Cement Height (OUT): 0.0 ft
Cement Height (IN): 0.0 ft
Leave On CICR: 1.0 bbl
PUMP SCHEDULE
-------------
Pump Slurry: 21.18 bbl
Mix Water: 12.088 bbl (507.7 gal)
Displacement Water: 14.674 bbl
Generated by Field Scorpion
STUB
2026-04-06 03:40
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1759.35 ft
TOC (Tubing IN): 1752.22 ft
Cement Height (OUT): 340.65 ft
Cement Height (IN): 347.78 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 11.905 bbl (500.0 gal)
Displacement Water: 6.772 bbl
Generated by Field Scorpion
BALANCE
2026-04-06 03:35
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 22.8
Slurry Volume: 4.66 bbl
Mix Water: 2.709 bbl
Mix Water: 113.784 gal
TOC (Tubing OUT): 1700.0 ft
TOC (Tubing IN): 1665.26 ft
Cement Height (OUT): 300.0 ft
Cement Height (IN): 334.74 ft
PUMP SCHEDULE
-------------
Pump Slurry: 4.66 bbl
Mix Water: 2.709 bbl (113.784 gal)
Displacement Water: 6.436 bbl
Generated by Field Scorpion
BALANCE
2026-04-05 14:12
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 115.2
Slurry Volume: 23.6 bbl
Mix Water: 13.715 bbl
Mix Water: 576.033 gal
TOC (Tubing OUT): 1700.0 ft
TOC (Tubing IN): 1693.72 ft
Cement Height (OUT): 300.0 ft
Cement Height (IN): 306.28 ft
PUMP SCHEDULE
-------------
Pump Slurry: 23.6 bbl
Mix Water: 13.715 bbl (576.033 gal)
Displacement Water: 6.546 bbl
Generated by Field Scorpion
STUB
2026-04-05 10:00
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 17.41 bbl
Mix Water: 10.119 bbl
Mix Water: 425.0 gal
TOC (Tubing OUT): 1798.41 ft
TOC (Tubing IN): 1792.1 ft
Cement Height (OUT): 301.59 ft
Cement Height (IN): 307.9 ft
PUMP SCHEDULE
-------------
Pump Slurry: 17.41 bbl
Mix Water: 10.119 bbl (425.0 gal)
Displacement Water: 6.926 bbl
Generated by Field Scorpion
STUB
2026-04-05 09:37
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 17.41 bbl
Mix Water: 0.0 bbl
Mix Water: 0.0 gal
TOC (Tubing OUT): 1798.41 ft
TOC (Tubing IN): 1792.1 ft
Cement Height (OUT): 301.59 ft
Cement Height (IN): 307.9 ft
PUMP SCHEDULE
-------------
Pump Slurry: 17.41 bbl
Mix Water: 0.0 bbl (0.0 gal)
Displacement Water: 6.926 bbl
Generated by Field Scorpion
STUB
2026-04-05 09:34
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 17.41 bbl
Mix Water: 0.0 bbl
Mix Water: 0.0 gal
TOC (Tubing OUT): 1798.41 ft
TOC (Tubing IN): 1792.1 ft
Cement Height (OUT): 301.59 ft
Cement Height (IN): 307.9 ft
PUMP SCHEDULE
-------------
Pump Slurry: 17.41 bbl
Mix Water: 0.0 bbl (0.0 gal)
Displacement Water: 6.926 bbl
Generated by Field Scorpion
STUB
2026-04-05 07:03
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 17.41 bbl
Mix Water: 0.0 bbl
Mix Water: 0.0 gal
TOC (Tubing OUT): 1798.41 ft
TOC (Tubing IN): 1792.1 ft
Cement Height (OUT): 301.59 ft
Cement Height (IN): 307.9 ft
PUMP SCHEDULE
-------------
Pump Slurry: 17.41 bbl
Mix Water: 0.0 bbl (0.0 gal)
Displacement Water: 6.926 bbl
Generated by Field Scorpion
STUB
2026-04-05 06:31
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 17.41 bbl
Mix Water: 0.0 bbl
Mix Water: 0.0 gal
TOC (Tubing OUT): 1798.41 ft
TOC (Tubing IN): 1792.1 ft
Cement Height (OUT): 301.59 ft
Cement Height (IN): 307.9 ft
PUMP SCHEDULE
-------------
Pump Slurry: 17.41 bbl
Mix Water: 0.0 bbl (0.0 gal)
Displacement Water: 6.926 bbl
Generated by Field Scorpion
STUB
2026-04-05 06:26
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 17.41 bbl
Mix Water: 0.0 bbl
Mix Water: 0.0 gal
TOC (Tubing OUT): 1798.41 ft
TOC (Tubing IN): 1792.1 ft
Cement Height (OUT): 301.59 ft
Cement Height (IN): 307.9 ft
PUMP SCHEDULE
-------------
Pump Slurry: 17.41 bbl
Mix Water: 0.0 bbl (0.0 gal)
Displacement Water: 6.926 bbl
Generated by Field Scorpion
STUB
2026-04-05 06:22
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 17.41 bbl
Mix Water: 0.0 bbl
Mix Water: 0.0 gal
TOC (Tubing OUT): 1798.41 ft
TOC (Tubing IN): 1792.1 ft
Cement Height (OUT): 301.59 ft
Cement Height (IN): 307.9 ft
PUMP SCHEDULE
-------------
Pump Slurry: 17.41 bbl
Mix Water: 0.0 bbl (0.0 gal)
Displacement Water: 6.926 bbl
Generated by Field Scorpion
STUB
2026-04-05 06:21
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 17.41 bbl
Mix Water: 0.0 bbl
Mix Water: 0.0 gal
TOC (Tubing OUT): 1798.41 ft
TOC (Tubing IN): 1792.1 ft
Cement Height (OUT): 301.59 ft
Cement Height (IN): 307.9 ft
PUMP SCHEDULE
-------------
Pump Slurry: 17.41 bbl
Mix Water: 0.0 bbl (0.0 gal)
Displacement Water: 6.926 bbl
Generated by Field Scorpion
STUB
2026-04-05 06:20
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 17.41 bbl
Mix Water: 0.0 bbl
Mix Water: 0.0 gal
TOC (Tubing OUT): 1798.41 ft
TOC (Tubing IN): 1792.1 ft
Cement Height (OUT): 301.59 ft
Cement Height (IN): 307.9 ft
PUMP SCHEDULE
-------------
Pump Slurry: 17.41 bbl
Mix Water: 0.0 bbl (0.0 gal)
Displacement Water: 6.926 bbl
Generated by Field Scorpion
STUB
2026-04-05 06:14
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 17.41 bbl
Mix Water: 0.0 bbl
Mix Water: 0.0 gal
TOC (Tubing OUT): 1798.41 ft
TOC (Tubing IN): 1792.1 ft
Cement Height (OUT): 301.59 ft
Cement Height (IN): 307.9 ft
PUMP SCHEDULE
-------------
Pump Slurry: 17.41 bbl
Mix Water: 0.0 bbl (0.0 gal)
Displacement Water: 6.926 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 03:46
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 03:42
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 03:30
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 03:21
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 03:21
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 03:17
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 03:17
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 03:12
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 03:12
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 03:11
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 03:00
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 02:59
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 153.6
Slurry Volume: 31.46 bbl
Mix Water: 18.287 bbl
Mix Water: 768.044 gal
TOC (Tubing OUT): 1600.0 ft
TOC (Tubing IN): 1595.59 ft
Cement Height (OUT): 400.0 ft
Cement Height (IN): 404.41 ft
PUMP SCHEDULE
-------------
Pump Slurry: 31.46 bbl
Mix Water: 18.287 bbl (768.044 gal)
Displacement Water: 1.052 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 02:56
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 153.6
Slurry Volume: 31.46 bbl
Mix Water: 18.287 bbl
Mix Water: 768.044 gal
TOC (Tubing OUT): 1600.0 ft
TOC (Tubing IN): 1595.59 ft
Cement Height (OUT): 400.0 ft
Cement Height (IN): 404.41 ft
PUMP SCHEDULE
-------------
Pump Slurry: 31.46 bbl
Mix Water: 18.287 bbl (768.044 gal)
Displacement Water: 1.052 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 02:55
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 153.6
Slurry Volume: 31.46 bbl
Mix Water: 18.287 bbl
Mix Water: 768.044 gal
TOC (Tubing OUT): 1600.0 ft
TOC (Tubing IN): 1595.59 ft
Cement Height (OUT): 400.0 ft
Cement Height (IN): 404.41 ft
PUMP SCHEDULE
-------------
Pump Slurry: 31.46 bbl
Mix Water: 18.287 bbl (768.044 gal)
Displacement Water: 1.052 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 02:45
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 153.6
Slurry Volume: 31.46 bbl
Mix Water: 18.287 bbl
Mix Water: 768.044 gal
TOC (Tubing OUT): 1600.0 ft
TOC (Tubing IN): 1595.59 ft
Cement Height (OUT): 400.0 ft
Cement Height (IN): 404.41 ft
PUMP SCHEDULE
-------------
Pump Slurry: 31.46 bbl
Mix Water: 18.287 bbl (768.044 gal)
Displacement Water: 1.052 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 02:45
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1646.14 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 353.86 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 1.085 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 02:42
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1646.14 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 353.86 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 1.085 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 02:36
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1646.14 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 353.86 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 16.001 bbl (672.039 gal)
Displacement Water: 1.085 bbl
Generated by Field Scorpion
BALANCE
2026-04-03 02:27
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 672.039 gal
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-04-01 04:31
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 30.3
Slurry Volume: 6.21 bbl
Mix Water: 3.612 bbl
Mix Water: 151.712 gal
TOC (Tubing OUT): 1600.0 ft
TOC (Tubing IN): 1553.68 ft
Cement Height (OUT): 400.0 ft
Cement Height (IN): 446.32 ft
PUMP SCHEDULE
-------------
Pump Slurry: 6.21 bbl
Mix Water: 151.712 gal
Displacement Water: 6.004 bbl
Generated by Field Scorpion
BALANCE
2026-04-01 04:29
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 384.0
Slurry Volume: 78.65 bbl
Mix Water: 45.717 bbl
Mix Water: 1920.11 gal
TOC (Tubing OUT): 1000.0 ft
TOC (Tubing IN): 979.07 ft
Cement Height (OUT): 1000.0 ft
Cement Height (IN): 1020.93 ft
PUMP SCHEDULE
-------------
Pump Slurry: 78.65 bbl
Mix Water: 1920.11 gal
Displacement Water: 3.784 bbl
Generated by Field Scorpion
BALANCE
2026-04-01 04:05
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 384.0
Slurry Volume: 78.65 bbl
Mix Water: 45.717 bbl
Mix Water: 1920.11 gal
TOC (Tubing OUT): 1000.0 ft
TOC (Tubing IN): 979.07 ft
Cement Height (OUT): 1000.0 ft
Cement Height (IN): 1020.93 ft
PUMP SCHEDULE
-------------
Pump Slurry: 78.65 bbl
Mix Water: 1920.11 gal
Displacement Water: 3.784 bbl
Generated by Field Scorpion
BALANCE
2026-04-01 04:01
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 384.0
Slurry Volume: 78.65 bbl
Mix Water: 45.717 bbl
Mix Water: 1920.11 gal
TOC (Tubing OUT): 1000.0 ft
TOC (Tubing IN): 979.07 ft
Cement Height (OUT): 1000.0 ft
Cement Height (IN): 1020.93 ft
PUMP SCHEDULE
-------------
Pump Slurry: 78.65 bbl
Mix Water: 1920.11 gal
Displacement Water: 3.784 bbl
Generated by Field Scorpion
BALANCE
2026-04-01 04:01
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 384.0
Slurry Volume: 78.65 bbl
Mix Water: 45.717 bbl
Mix Water: 1920.11 gal
TOC (Tubing OUT): 1000.0 ft
TOC (Tubing IN): 979.07 ft
Cement Height (OUT): 1000.0 ft
Cement Height (IN): 1020.93 ft
PUMP SCHEDULE
-------------
Pump Slurry: 78.65 bbl
Mix Water: 1920.11 gal
Displacement Water: 3.784 bbl
Generated by Field Scorpion
BALANCE
2026-04-01 03:49
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 384.0
Slurry Volume: 78.65 bbl
Mix Water: 45.717 bbl
Mix Water: 1920.11 gal
TOC (Tubing OUT): 1000.0 ft
TOC (Tubing IN): 979.07 ft
Cement Height (OUT): 1000.0 ft
Cement Height (IN): 1020.93 ft
PUMP SCHEDULE
-------------
Pump Slurry: 78.65 bbl
Mix Water: 1920.11 gal
Displacement Water: 3.784 bbl
Generated by Field Scorpion
BALANCE
2026-04-01 03:31
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 115.2
Slurry Volume: 23.6 bbl
Mix Water: 13.715 bbl
Mix Water: 576.033 gal
TOC (Tubing OUT): 1700.0 ft
TOC (Tubing IN): 1693.72 ft
Cement Height (OUT): 300.0 ft
Cement Height (IN): 306.28 ft
PUMP SCHEDULE
-------------
Pump Slurry: 23.6 bbl
Mix Water: 576.033 gal
Displacement Water: 6.546 bbl
Generated by Field Scorpion
BALANCE
2026-04-01 02:55
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 96.0
Slurry Volume: 19.66 bbl
Mix Water: 11.429 bbl
Mix Water: 480.028 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1744.77 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 255.23 ft
PUMP SCHEDULE
-------------
Pump Slurry: 19.66 bbl
Mix Water: 480.028 gal
Displacement Water: 6.743 bbl
Generated by Field Scorpion
BALANCE
2026-03-29 18:53
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 19.0
Slurry Volume: 3.88 bbl
Mix Water: 2.258 bbl
Mix Water: 94.82 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1721.05 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 278.95 ft
PUMP SCHEDULE
-------------
Pump Slurry: 3.88 bbl
Mix Water: 94.82 gal
Displacement Water: 6.651 bbl
Generated by Field Scorpion
BALANCE
2026-03-29 18:20
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 19.0
Slurry Volume: 3.88 bbl
Mix Water: 2.258 bbl
Mix Water: 94.82 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1721.05 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 278.95 ft
PUMP SCHEDULE
-------------
Pump Slurry: 3.88 bbl
Mix Water: 94.82 gal
Displacement Water: 6.651 bbl
Generated by Field Scorpion
BALANCE
2026-03-29 17:59
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 19.0
Slurry Volume: 3.88 bbl
Mix Water: 2.258 bbl
Mix Water: 94.82 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1721.05 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 278.95 ft
PUMP SCHEDULE
-------------
Pump Slurry: 3.88 bbl
Mix Water: 94.82 gal
Displacement Water: 6.651 bbl
Generated by Field Scorpion
BALANCE
2026-03-29 17:53
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 19.0
Slurry Volume: 3.88 bbl
Mix Water: 2.258 bbl
Mix Water: 94.82 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1721.05 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 278.95 ft
PUMP SCHEDULE
-------------
Pump Slurry: 3.88 bbl
Mix Water: 94.82 gal
Displacement Water: 6.651 bbl
Generated by Field Scorpion
BALANCE
2026-03-29 17:42
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 19.0
Slurry Volume: 3.88 bbl
Mix Water: 2.258 bbl
Mix Water: 94.82 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1721.05 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 278.95 ft
PUMP SCHEDULE
-------------
Pump Slurry: 3.88 bbl
Mix Water: 94.82 gal
Displacement Water: 6.651 bbl
Generated by Field Scorpion
BALANCE
2026-03-29 17:17
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 19.0
Slurry Volume: 3.88 bbl
Mix Water: 2.258 bbl
Mix Water: 94.82 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1721.05 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 278.95 ft
PUMP SCHEDULE
-------------
Pump Slurry: 3.88 bbl
Mix Water: 94.82 gal
Displacement Water: 6.651 bbl
Generated by Field Scorpion
BALANCE
2026-03-29 17:16
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 19.0
Slurry Volume: 3.88 bbl
Mix Water: 2.258 bbl
Mix Water: 94.82 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1721.05 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 278.95 ft
PUMP SCHEDULE
-------------
Pump Slurry: 3.88 bbl
Mix Water: 94.82 gal
Displacement Water: 6.651 bbl
Generated by Field Scorpion
BALANCE
2026-03-28 15:25
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 19.0
Slurry Volume: 3.88 bbl
Mix Water: 2.258 bbl
Mix Water: 94.82 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1721.05 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 278.95 ft
PUMP SCHEDULE
-------------
Pump Slurry: 3.88 bbl
Mix Water: 94.82 gal
Displacement Water: 6.651 bbl
Generated by Field Scorpion
BALANCE
2026-03-28 15:25
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 19.0
Slurry Volume: 3.88 bbl
Mix Water: 2.258 bbl
Mix Water: 94.82 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1721.05 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 278.95 ft
PUMP SCHEDULE
-------------
Pump Slurry: 3.88 bbl
Mix Water: 94.82 gal
Displacement Water: 6.651 bbl
Generated by Field Scorpion
BALANCE
2026-03-28 15:07
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 19.0
Slurry Volume: 3.88 bbl
Mix Water: 2.258 bbl
Mix Water: 94.82 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1721.05 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 278.95 ft
PUMP SCHEDULE
-------------
Pump Slurry: 3.88 bbl
Mix Water: 94.82 gal
Displacement Water: 6.651 bbl
Generated by Field Scorpion
BALANCE
2026-03-28 15:05
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 96.0
Slurry Volume: 19.66 bbl
Mix Water: 11.429 bbl
Mix Water: 480.028 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1744.77 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 255.23 ft
PUMP SCHEDULE
-------------
Pump Slurry: 19.66 bbl
Mix Water: 480.028 gal
Displacement Water: 6.743 bbl
Generated by Field Scorpion
BALANCE
2026-03-28 14:44
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 96.0
Slurry Volume: 19.66 bbl
Mix Water: 11.429 bbl
Mix Water: 480.028 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1744.77 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 255.23 ft
PUMP SCHEDULE
-------------
Pump Slurry: 19.66 bbl
Mix Water: 480.028 gal
Displacement Water: 6.743 bbl
Generated by Field Scorpion
BALANCE
2026-03-27 04:21
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Desired TOC → Find Sacks
Required Sacks: 19.0
Slurry Volume: 3.88 bbl
Mix Water: 2.258 bbl
Mix Water: 94.82 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1721.05 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 278.95 ft
PUMP SCHEDULE
-------------
Pump Slurry: 3.88 bbl
Mix Water: 94.82 gal
Displacement Water: 6.651 bbl
Generated by Field Scorpion
BALANCE
2026-03-18 15:30
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 90.1
Slurry Volume: 19.42 bbl
Mix Water: 11.192 bbl
Mix Water: 470.058 gal
TOC (Tubing OUT): 1098.0 ft
TOC (Tubing IN): 1094.62 ft
Cement Height (OUT): 200.0 ft
Cement Height (IN): 203.38 ft
PUMP SCHEDULE
-------------
Pump Slurry: 19.42 bbl
Mix Water: 470.058 gal
Displacement Water: 4.23 bbl
Generated by Field Scorpion
BALANCE
2026-03-18 15:27
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 268.8
Slurry Volume: 55.06 bbl
Mix Water: 32.002 bbl
Mix Water: 1344.077 gal
TOC (Tubing OUT): 1300.0 ft
TOC (Tubing IN): 1285.35 ft
Cement Height (OUT): 700.0 ft
Cement Height (IN): 714.65 ft
PUMP SCHEDULE
-------------
Pump Slurry: 55.06 bbl
Mix Water: 1344.077 gal
Displacement Water: 4.967 bbl
Generated by Field Scorpion
STUB
2026-03-18 06:37
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1760.25 ft
TOC (Tubing IN): 1753.14 ft
Cement Height (OUT): 339.75 ft
Cement Height (IN): 346.86 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 6.775 bbl
Generated by Field Scorpion
BALANCE
2026-03-18 05:20
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 672.039 gal
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-03-18 05:03
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 672.039 gal
Displacement Water: 6.348 bbl
Generated by Field Scorpion
BALANCE
2026-03-18 04:57
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.4
Slurry Volume: 27.53 bbl
Mix Water: 16.001 bbl
Mix Water: 672.039 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.67 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.33 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.53 bbl
Mix Water: 672.039 gal
Displacement Water: 6.348 bbl
Generated by Field Scorpion
STUB
2026-03-17 15:14
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1760.25 ft
TOC (Tubing IN): 1753.14 ft
Cement Height (OUT): 339.75 ft
Cement Height (IN): 346.86 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 6.775 bbl
Generated by Field Scorpion
BALANCE
2026-03-17 14:22
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 115.2
Slurry Volume: 23.6 bbl
Mix Water: 13.715 bbl
Mix Water: 576.033 gal
TOC (Tubing OUT): 1700.0 ft
TOC (Tubing IN): 1693.72 ft
Cement Height (OUT): 300.0 ft
Cement Height (IN): 306.28 ft
PUMP SCHEDULE
-------------
Pump Slurry: 23.6 bbl
Mix Water: 576.033 gal
Displacement Water: 6.546 bbl
Generated by Field Scorpion
BALANCE
2026-03-17 12:28
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 115.2
Slurry Volume: 23.6 bbl
Mix Water: 13.715 bbl
Mix Water: 576.033 gal
TOC (Tubing OUT): 1700.0 ft
TOC (Tubing IN): 1693.72 ft
Cement Height (OUT): 300.0 ft
Cement Height (IN): 306.28 ft
PUMP SCHEDULE
-------------
Pump Slurry: 23.6 bbl
Mix Water: 576.033 gal
Displacement Water: 6.546 bbl
Generated by Field Scorpion
BALANCE
2026-03-17 12:27
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 115.2
Slurry Volume: 23.6 bbl
Mix Water: 13.715 bbl
Mix Water: 576.033 gal
TOC (Tubing OUT): 1700.0 ft
TOC (Tubing IN): 1696.69 ft
Cement Height (OUT): 300.0 ft
Cement Height (IN): 303.31 ft
PUMP SCHEDULE
-------------
Pump Slurry: 23.6 bbl
Mix Water: 576.033 gal
Displacement Water: 1.119 bbl
Generated by Field Scorpion
BALANCE
2026-03-17 04:58
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Given Sacks → Find TOC
Required Sacks: 100.0
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1739.6 ft
TOC (Tubing IN): 1734.15 ft
Cement Height (OUT): 260.4 ft
Cement Height (IN): 265.85 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 6.702 bbl
Generated by Field Scorpion
STUB
2026-03-16 05:11
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1759.41 ft
TOC (Tubing IN): 1752.3 ft
Cement Height (OUT): 340.59 ft
Cement Height (IN): 347.7 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 6.782 bbl
Generated by Field Scorpion
STUB
2026-03-16 03:46
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1759.41 ft
TOC (Tubing IN): 1752.3 ft
Cement Height (OUT): 340.59 ft
Cement Height (IN): 347.7 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 6.782 bbl
Generated by Field Scorpion
STUB
2026-03-16 03:39
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1759.41 ft
TOC (Tubing IN): 1747.28 ft
Cement Height (OUT): 340.59 ft
Cement Height (IN): 352.72 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 6.762 bbl
Generated by Field Scorpion
STUB
2026-03-15 18:21
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1759.41 ft
TOC (Tubing IN): 1733.92 ft
Cement Height (OUT): 340.59 ft
Cement Height (IN): 366.08 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 6.71 bbl
Generated by Field Scorpion
BALANCE
2026-03-15 18:09
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 134.5
Slurry Volume: 27.54 bbl
Mix Water: 16.008 bbl
Mix Water: 672.315 gal
TOC (Tubing OUT): 1650.0 ft
TOC (Tubing IN): 1642.69 ft
Cement Height (OUT): 350.0 ft
Cement Height (IN): 357.31 ft
PUMP SCHEDULE
-------------
Pump Slurry: 27.54 bbl
Mix Water: 672.315 gal
Displacement Water: 6.357 bbl
Generated by Field Scorpion
STUB
2026-03-15 05:57
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1759.41 ft
TOC (Tubing IN): 1733.92 ft
Cement Height (OUT): 340.59 ft
Cement Height (IN): 366.08 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 6.71 bbl
Generated by Field Scorpion
STUB
2026-03-15 05:55
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1759.41 ft
TOC (Tubing IN): 1733.92 ft
Cement Height (OUT): 340.59 ft
Cement Height (IN): 366.08 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 6.71 bbl
Generated by Field Scorpion
STUB
2026-03-14 17:40
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1760.36 ft
TOC (Tubing IN): 1734.94 ft
Cement Height (OUT): 339.64 ft
Cement Height (IN): 365.06 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 8.6 bbl
Generated by Field Scorpion
STUB
2026-03-14 17:24
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1760.36 ft
TOC (Tubing IN): 1758.09 ft
Cement Height (OUT): 339.64 ft
Cement Height (IN): 341.91 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 8.715 bbl
Generated by Field Scorpion
BALANCE
2026-03-14 17:02
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 96.0
Slurry Volume: 19.67 bbl
Mix Water: 11.434 bbl
Mix Water: 480.225 gal
TOC (Tubing OUT): 1750.0 ft
TOC (Tubing IN): 1748.33 ft
Cement Height (OUT): 250.0 ft
Cement Height (IN): 251.67 ft
PUMP SCHEDULE
-------------
Pump Slurry: 19.67 bbl
Mix Water: 480.225 gal
Displacement Water: 8.667 bbl
Generated by Field Scorpion
BALANCE
2026-03-14 04:41
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 115.3
Slurry Volume: 23.61 bbl
Mix Water: 13.724 bbl
Mix Water: 576.392 gal
TOC (Tubing OUT): 1700.0 ft
TOC (Tubing IN): 1700.0 ft
Cement Height (OUT): 300.0 ft
Cement Height (IN): 300.0 ft
PUMP SCHEDULE
-------------
Pump Slurry: 23.61 bbl
Mix Water: 576.392 gal
Displacement Water: 6.579 bbl
Generated by Field Scorpion
BALANCE
2026-03-14 04:00
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 115.3
Slurry Volume: 23.61 bbl
Mix Water: 13.724 bbl
Mix Water: 576.392 gal
TOC (Tubing OUT): 1700.0 ft
TOC (Tubing IN): 1693.66 ft
Cement Height (OUT): 300.0 ft
Cement Height (IN): 306.34 ft
PUMP SCHEDULE
-------------
Pump Slurry: 23.61 bbl
Mix Water: 576.392 gal
Displacement Water: 6.554 bbl
Generated by Field Scorpion
BALANCE
2026-03-14 03:59
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Desired TOC → Find Sacks
Required Sacks: 461.1
Slurry Volume: 94.44 bbl
Mix Water: 54.894 bbl
Mix Water: 2305.568 gal
TOC (Tubing OUT): 800.0 ft
TOC (Tubing IN): 774.62 ft
Cement Height (OUT): 1200.0 ft
Cement Height (IN): 1225.38 ft
PUMP SCHEDULE
-------------
Pump Slurry: 94.44 bbl
Mix Water: 2305.568 gal
Displacement Water: 2.998 bbl
Generated by Field Scorpion
BALANCE
2026-03-13 13:03
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Given Sacks → Find TOC
Required Sacks: 100.0
Slurry Volume: 25.18 bbl
Mix Water: 16.421 bbl
Mix Water: 689.7 gal
TOC (Tubing OUT): 761.02 ft
TOC (Tubing IN): 754.25 ft
Cement Height (OUT): 319.98 ft
Cement Height (IN): 326.75 ft
PUMP SCHEDULE
-------------
Pump Slurry: 25.18 bbl
Mix Water: 689.7 gal
Displacement Water: 2.919 bbl
Generated by Field Scorpion
BALANCE
2026-03-13 12:45
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Open Hole
Workflow: Given Sacks → Find TOC
Required Sacks: 100.0
Slurry Volume: 25.18 bbl
Mix Water: 16.421 bbl
Mix Water: 689.7 gal
TOC (Tubing OUT): 761.02 ft
TOC (Tubing IN): 754.25 ft
Cement Height (OUT): 319.98 ft
Cement Height (IN): 326.75 ft
PUMP SCHEDULE
-------------
Pump Slurry: 25.18 bbl
Mix Water: 689.7 gal
Displacement Water: 2.919 bbl
Generated by Field Scorpion
STUB
2026-03-13 05:19
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Stub Plug
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1759.46 ft
TOC (Tubing IN): 1752.38 ft
Cement Height (OUT): 340.54 ft
Cement Height (IN): 347.62 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 6.782 bbl
Generated by Field Scorpion
BALANCE
2026-03-13 05:06
FIELD SCORPION JOB TICKET
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Workflow: Given Sacks → Find TOC
Required Sacks: 100.0
Slurry Volume: 20.48 bbl
Mix Water: 11.905 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 678.65 ft
TOC (Tubing IN): 533.94 ft
Cement Height (OUT): 1321.35 ft
Cement Height (IN): 1466.06 ft
PUMP SCHEDULE
-------------
Pump Slurry: 20.48 bbl
Mix Water: 500.0 gal
Displacement Water: 2.066 bbl
Generated by Field Scorpion
STUB
2026-03-13 04:11
FIELD SCORPION JOB SUMMARY
--------------------------
Job Type: Stub Plug
Cement Bbl: 21.37
Mix Water Bbl: 13.36
Mix Water Gal: 561.0
Toc Out: 1748.1
Toc In: 1740.8
Cement Height Out Ft: 351.9
Cement Height In Ft: 359.2
Displacement Water Bbl: 6.74
Pump Slurry Bbl: 21.37
Pump Displacement Bbl: 6.74
Generated by Field Scorpion
CICR
2026-03-13 04:04
FIELD SCORPION JOB SUMMARY
--------------------------
Job Type: CICR Squeeze
Job Style: Rollover
Cement Bbl: 20.48
Mix Water Bbl: 11.9
Mix Water Gal: 500.0
Toc Out: 1806.45
Toc In: 1785.25
Cement Height Out Ft: 193.55
Cement Height In Ft: 214.75
Displacement Water Bbl: 6.91
Pump Slurry Bbl: 20.48
Pump Displacement Bbl: 6.91
Leave Bbl: 3.0
Generated by Field Scorpion
BALANCE
2026-03-13 03:26
FIELD SCORPION JOB SUMMARY
--------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Job Style: Given Sacks → Find TOC
Cement Bbl: 20.48
Required Sacks: 100.0
Mix Water Bbl: 11.9
Mix Water Gal: 500.0
Toc Out: 678.7
Toc In: 533.9
Cement Height Out Ft: 1321.3
Cement Height In Ft: 1466.1
Displacement Water Bbl: 2.07
Pump Slurry Bbl: 20.48
Pump Displacement Bbl: 2.07
Generated by Field Scorpion
BALANCE
2026-03-12 18:18
FIELD SCORPION JOB SUMMARY
--------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Job Style: Desired TOC → Find Sacks
Cement Bbl: 17.05
Required Sacks: 83.2
Mix Water Bbl: 9.91
Mix Water Gal: 416.2
Toc Out: 900.0
Toc In: 779.5
Cement Height Out Ft: 1100.0
Cement Height In Ft: 1220.5
Displacement Water Bbl: 3.02
Pump Slurry Bbl: 17.05
Pump Displacement Bbl: 3.02
Generated by Field Scorpion
CICR
2026-03-12 10:48
FIELD SCORPION JOB SUMMARY
--------------------------
Job Type: CICR Squeeze
Job Style: Rollover
Cement Bbl: 20.48
Mix Water Bbl: 11.9
Mix Water Gal: 500.0
Toc Out: 1806.45
Toc In: 1785.25
Displacement Water Bbl: 6.91
Leave Bbl: 3.0
Generated by Field Scorpion
BALANCE
2026-03-12 08:31
FIELD SCORPION JOB SUMMARY
-------------------------
Job Type: Balance Plug
Mode: Tubing in Casing
Cement Bbl: 14.34
Mix Water Bbl: 8.33
Mix Water Gal: 350.0
Toc Out: 1075.1
Toc In: 973.8
Displacement Water Bbl: 3.77
Generated by Field Scorpion
ROLLOVER
2026-03-12 08:11
FIELD SCORPION JOB SUMMARY
-------------------------
Job Type: Rollover
Cement Volume: 20.48 bbl
Mix Water: 11.9 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1806.45 ft
TOC (Tubing IN): 1785.25 ft
Displacement Water: 6.91 bbl
Generated by Field Scorpion
ROLLOVER
2026-03-12 08:11
FIELD SCORPION JOB SUMMARY
-------------------------
Job Type: Rollover
Cement Volume: 20.48 bbl
Mix Water: 11.9 bbl
Mix Water: 500.0 gal
TOC (Tubing OUT): 1806.45 ft
TOC (Tubing IN): 1785.25 ft
Displacement Water: 6.91 bbl
Generated by Field Scorpion
ROLLOVER
2026-03-12 04:09
Field Scorpion - Rollover
Cement Bbl: 20.48
Mix Water Bbl: 11.9
Mix Water Gal: 500.0
Toc Out: 1965.7
Toc In: 1785.3
Displacement Water Bbl: 6.91
Cicr: 2000.0
Top Perf: 1700.0
Bottom Perf: 2300.0
Toc On Cicr: 1785.3
Slurry Remaining Bbl: 13.57
Perf Note:
Casing Cap: 0.0155